Key factors that affect LiDAR survey pricing
Site size
Larger sites generally cost more in total, but often have a lower cost per acre due to flight efficiency. Small sites under 5 acres may have a minimum project fee to cover mobilization and processing time.
Terrain & vegetation density
Heavily forested or vegetated sites require more processing time to achieve accurate Natural Ground Level (NGL) data, which can affect pricing compared to open, clear sites.
Accuracy requirements
Projects requiring design-grade accuracy tied to client-provided control points typically involve additional coordination and processing compared to general topographic mapping.
Deliverable format
Standard deliverables (DWG, point cloud) are typically included in base pricing, while additional formats or custom processing may affect total cost.
Turnaround time
Most projects are completed within 3 to 7 business days. Rush turnaround requests may affect scheduling and pricing.
What's typically included in a LiDAR survey quote
- Site mobilization and drone flight time
- Point cloud data processing and classification
- Standard deliverables in DWG format
- Basic quality control and georeferencing
Get an accurate quote for your project
Because every project is different, the most accurate way to understand your LiDAR survey cost is to request a free quote. See our published rates by project size, or send us the scope and we will build a quote around it.
Frequently asked questions
How much does a LiDAR survey cost?
A drone LiDAR survey starts at a $1,500 minimum and is priced per acre, with the rate falling as the site grows. Small sites under five acres run about $300 per acre. At 26 to 50 acres the rate is $150 per acre, and at 251 to 500 acres it drops to $50 per acre. Terrain, canopy, required accuracy, and travel all affect the final quote.
How much does a LiDAR drone survey cost?
Drone LiDAR is priced per acre with a $1,500 minimum. Expect roughly $300 per acre on sites under five acres, $150 per acre between 26 and 50 acres, and $50 per acre on sites over 250 acres. Cut and fill analysis runs $800 to $3,500 per flight. Travel, mobilization, and any airspace authorization are itemized separately in every quote.