Land & site development surveying

Land & site development UAV topographic mapping

A land development LiDAR survey records existing ground conditions across a parcel before the first blade touches dirt. We fly drone-mounted LiDAR with RTK GNSS ground control to produce the elevation surfaces, contours, and terrain models your civil team needs for planning, grading, and stormwater design, collected in a fraction of the time a conventional ground survey requires, even on wooded or steep ground.

What you get

What we deliver

Every deliverable below is about topographic and terrain data, including existing ground, contours, drainage, and earthwork. We do not establish property lines, plats, or legal descriptions here; that is a boundary survey and a different scope.

01

Existing-conditions topographic maps

A base map of the parcel as it sits today, with 1-foot and 2-foot contours, spot elevations, breaklines along roads, ditches, and banks, and visible surface features. This is the starting surface your civil team builds grading and layout on. Delivered as DWG and DXF, and opens directly in AutoCAD Civil 3D, Bentley MicroStation, and OpenRoads. Planimetric mapping can be added to the same base plan, so curb lines, pavement edges, and visible utility surface features are drawn as linework alongside the contours. The as-built CAD package gives your design team a single drawing set with both the ground and what sits on it.

02

Contour data

Clean, indexed contours at the interval your design calls for, generated from the classified ground surface rather than interpolated from sparse shots. Delivered as DWG/DXF with polylines at elevation, plus a GeoTIFF elevation surface for GIS use.

03

Drainage & watershed information

Flow direction, catchment boundaries, ridgelines, and low points derived from the terrain model, the inputs your engineer needs for stormwater design and detention sizing. Delivered as shapefile (SHP) and GeoTIFF, and opens in ArcGIS and QGIS. Drainage and watershed mapping at this resolution catches ponding and concentration issues before they show up in a grading plan review.

04

Bare-earth terrain model

A digital terrain model (DTM) with vegetation, fences, and structures stripped out so the surface represents true ground. This is what grading, earthwork, and stormwater calcs run against. Delivered as a classified LAS/LAZ point cloud plus a raster DTM in GeoTIFF, and opens in Civil 3D, ArcGIS, and QGIS. A bare earth terrain model is the difference between designing against actual ground and designing against a canopy surface.

05

Cut & fill volumes

Earthwork quantities between the existing surface and a proposed or staked design surface, broken down by area. Useful for feasibility-level cost estimates and for tracking earth moved once construction starts. Delivered as a PDF report with a cut/fill difference map plus CSV quantities.

Intended for planning, design, and quantity verification, not for certification. Where a project requires certified survey documents, the client's own surveyor handles that and we provide the data they work from.

How we work

How the surveying works

A site development survey follows the same path whether the parcel is a 15-acre residential subdivision or a 300-acre commercial tract. The timing below is what we typically hold; airspace and weather can shift it.

  1. 01

    Site assessment

    We walk the scope with you, covering parcel size, access, vegetation density, known control, and what the design team actually needs. Usually a short call plus a desktop review, 1 to 2 days before we mobilize.

  2. 02

    Airspace check

    We pull the airspace for the parcel and secure LAANC authorization where required. Most controlled-airspace approvals come back the same day; restricted or proximate-to-tower sites can take a day or two longer.

  3. 03

    Flight planning

    Altitude, flight line spacing, and overlap are set to the point density your deliverables need, tighter for grading-grade contours and wider for feasibility-level mapping. Planned the day before the flight.

  4. 04

    Ground control

    On the field day we set an RTK GNSS base and occupy control points across the site so the point cloud lands on your coordinate system and datum. An hour or two on site depending on acreage and control count.

  5. 05

    RTK capture

    The drone flies the planned grid with LiDAR running against the RTK base. A 100-acre parcel is typically flown in a single morning; larger sites take additional flights or a second day.

  6. 06

    Point cloud classification

    Back in the office we classify returns into ground, low vegetation, high vegetation, and buildings. This is the step that makes a usable surface possible, and it takes 1 to 2 days for a typical development parcel.

  7. 07

    Bare-earth extraction

    Non-ground returns are removed to produce the bare-earth surface, then contours, drainage, and the DTM are generated from it. Rolled into the processing window above.

  8. 08

    Deliverable QA

    We check control fit, look for voids and misclassification, and confirm contours read sensibly against the site before anything ships. A day, sometimes less. Total turnaround after data collection is typically 3 to 7 business days.

Where the data lands

From raw land to finished site

The same land development mapping carries value through every phase of a development. You collect once and reuse from feasibility through construction. Here is how the data supports each stage.

01

Feasibility studies

Before you commit to a site plan, the terrain model shows slope, drainage patterns, and buildable area across the full parcel. You can see where water collects, where grades get steep, and where earthwork will get expensive, early enough to shape the concept instead of fixing it later.

02

Grading design

Contours and the bare-earth DTM go straight into the grading plan. Your civil engineer designs cuts and fills against an actual ground surface instead of interpolating between widely spaced rod shots, which means fewer surprises when the site is staked.

03

Stormwater planning

Flow direction and catchment boundaries from the terrain model feed detention sizing, SWPPP layout, and drainage design. You see where runoff concentrates and where outlet structures need to land before the plan goes to review.

04

Earthwork tracking during construction

Once dirt starts moving, repeat flights measure cut and fill against the design surface so you can track quantities and progress against pay requests. For active sites, see our construction LiDAR survey work for the same data applied to grading checks and stockpile volumes.

For a closer look at the topographic deliverables themselves, including contour intervals, DTM structure, and file formats, see our LiDAR topographic survey page. For earthwork and progress tracking once construction is underway, see our construction LiDAR survey services.

Common questions

Frequently asked questions

How does LiDAR handle heavily wooded parcels?

LiDAR pulses penetrate gaps in the canopy, so we get ground returns under vegetation that photogrammetry and a walking crew would miss entirely. On a dense deciduous stand we still classify a usable ground surface; on thick evergreen cover the ground point density drops and we will tell you that up front so you can decide whether to supplement with conventional shots in the worst areas. Leaf-off conditions improve penetration noticeably, and we will recommend timing when it matters.

What site size range is practical?

The sweet spot is roughly 10 to 1,000 acres. Below 10 acres a conventional ground survey is often just as fast and cheaper. Above a few hundred acres we plan multiple flights and may stage a second day, but the per-acre cost keeps falling as size grows. Tell us the acreage and we will give you a straight answer on whether drone LiDAR is the right tool for it.

How does the cost compare to a ground survey on raw land?

On raw land of any meaningful size, drone LiDAR usually comes in lower per acre and faster than a conventional ground survey, especially on wooded, sloped, or wet ground where a crew moves slowly. On a small, open, flat parcel the ground survey can be cheaper. The tradeoff is point density versus the precision of individual rod shots. For grading and stormwater design the LiDAR surface is more than adequate, and we tie it to your control so it lands on the right coordinates.

What accuracy can I expect for grading design?

We work to 0.6 to 1.0 in (1.5 to 2.5 cm) vertical accuracy using RTK GNSS control and ground control, which is sufficient for grading design, earthwork quantities, and stormwater modeling on development sites. Final usable accuracy depends on control quality, vegetation, and slope. We will tell you what we can hold for your specific parcel when we quote it.

What is the turnaround time?

Typical turnaround is 3 to 7 business days after data collection. Mobilization depends on airspace, weather, and schedule, often within a few days of a signed quote. If you have a design or permitting milestone driving the schedule, tell us when you request the quote and we will plan acquisition and delivery around it.

Start your project

Get accurate terrain data for your next development project.

Tell us the parcel, the acreage, and your design milestone, and we will quote it straight.

Get a free quote

Based in Kansas City, working nationwide

The Kansas City metro is our base. Most Missouri and Kansas work sits inside a day's drive, and we mobilize to sites in every other state.

Travel and mobilization are itemized in the quote before you commit, so a project two states away is priced the same way as one across town.